Distribution-logistics centre of Delta Transport System Opened
10. march 2015.

The opening ceremony was attended by the president of Delta Holding Miroslav Miskovic and the president of the municipality of Zemun Djordje Radinović.

The distribution-logistic centre has the area of 20.730 square metres with the potential of constructing additional 14.500m2 of storage space in the second stage. The centre’s capacity is 26.000 pallet places with different temperature regimes ranging from -20 to +25°C.

"The most important news today is the creation of 400 new job positions," said the president of the Delta, Miroslav Miskovic, at the opening. "New employment nowadays is the most important task of the state as well as of us in the economy".

"Thanks to this investment, worth 10.2 million euros, DTS became one of the leaders in the field of domestic transportation, warehousing, spedition and logistics," said Vojin Milic, CEO of Delta Transport System (DTS).